A genetic algorithm for scheduling dual flow shops

Expert Systems with ApplicationsPublished 16 August 2011
Chie-Wun Chiou, Wen‐Ming Chen, Chin-Min Liu, Muh-Cherng Wu
Citations19
SJR quartileQ1
SJR score1.85
SNIP2.55

TL;DR

The proposed genetic algorithm (GA) embedded with the earliest due date (EDD) dispatching rule is used to prove that the grouping heuristic algorithm performs well and is developed to reduce setup time and due-date-based demand simultaneously.

Abstract

This study examines a dual-flow shop-scheduling problem that allows cross-shop processing. The scheduling objective is to minimize the coefficient of variation of slack time (lateness), where the slack time (ST) of a job denotes the difference between its due date and total completion time. This scheduling problem involves two decisions: job route assignment (assigning jobs to shops) and job sequencing. This study develops a genetic algorithm (GA) embedded with the earliest due date (EDD) dispatching rule for making these decisions. Numerical experiments with the GA algorithm indicate that the performance of adopting a cross-shop production policy may significantly outperform that of adopting a single-shop production policy. This is particularly true when the two flow shops are asymmetrically designed. This study develops a grouping heuristic algorithm to reduce setup time and due-date-based demand simultaneously. This study uses the proposed genetic algorithm (GA) to prove that the grouping heuristic algorithm performs well. Obtaining an approximate optimal solution makes it possible to decide the route assignment of jobs and the job sequencing of machines.

Keywords

Computer ScienceEngineering