Optimal periodic scheduling of multipurpose plants in the continuous time domain

Computers & Chemical EngineeringPublished 1 May 1997
G. Schilling, Constantinos C. Pantelides
Citations8
SJR quartileQ1
SJR score0.87
SNIP1.32

TL;DR

The paper describes a special branch-and-bound algorithm for solving the problem of determining an optimal periodic schedule for multipurpose plants comprising batch, semi-batch and continuous operations by branching on both discrete and continuous variables.

Abstract

This paper considers the problem of determining an optimal periodic schedule for multipurpose plants comprising batch, semi-batch and continuous operations. This aims to determine both the optimal duration of the operating cycle, and the precise nature and timing of operations taking place within it. The basis of our formulation is the general Resource-Task Network process representation coupled with a continuous representation of time. The presented mathematical formulation results in a non-convex mixed integer nonlinear programming (MINLP) problem. The paper describes a special branch-and-bound algorithm for solving this problem by branching on both discrete and continuous variables. The overall approach is demonstrated with an example.

Keywords

Engineering