login

Ten Steps to a Smarter Grid

IEEE Industry Applications MagazinePublished 17 February 2010
Steven E. Collier
Citations66
SJR quartileQ3
SJR score0.27
SNIP0.60

Abstract

The U.S. electric grid is not smart. It was not planned and constructed to be able to meet the new constraints, variables and uncertainties that the future holds. The central system architecture and operating schemes haven't really changed in a century. Long term construction and operations plans were founded upon the availability of extra capacity and redundancy to passively withstand short-term variation of demand, longer term growth and outages of lines and equipment. The traditional tools to achieve adequacy and reliability, additions to conventional generation, transmission and distribution assets, aren't as viable now. Already, electric utility performance indicators eroding: economy, reliability, security, asset value, profitability, sustainability, and service quality.

Keywords

Engineering