Automated construction system for high-rise reinforced concrete buildings
Generate an AI Snapshot to get a quick, structured summary of this paper.
A concise AI-generated summary of the paper will appear here once you click Generate AI Snapshot.
Abstract
An all-weather automated construction system has been developed to reduce the total cost of high-rise reinforced concrete building construction. It was applied for the first time ever to the construction of a 26-story reinforced concrete condominium project located in the Tokyo Metropolitan area in 1995. This system incorporates four major elements: (a) a synchronously climbing all-weather temporary roof; (b) a parallel material delivery system; (c) prefabrication and unification of construction materials; and (d) a material management system. It ensures good quality; improves working and environmental conditions; reduces the construction period, manpower, and waste; and improves overall productivity.
