The Productivity of Several Machines Under the Care of One Operator
Journal of the Royal Statistical Society Series B (Statistical Methodology)Published 1 January 1950
H. Ashcroft
Citations117
SJR quartileQ1
SJR score3.31
SNIP2.48
Generate an AI Snapshot to get a quick, structured summary of this paper.
Study Snapshot
ObjectiveStudy objective
MethodsResearch methodology
PopulationPopulation studied
Sample sizeSample sizes
OutcomesStudy outcomes here
ResultsStudy results comes here
LimitationsResearch study limitations comes here
A concise AI-generated summary of the paper will appear here once you click Generate AI Snapshot.
Abstract
Summary Probability concepts are applied to determine the extent to which the productivity of machines is reduced when one operator has charge of several so that, whenever two machines stop at about the same time, one has to stand idle until the operator has re-started the other. For the case when the requisite attention times for each re-start are equal, a table of the average number of machines running and a chart showing the most economical ratio of machines to operators have been prepared.
Keywords
Decision SciencesEngineering
