login

A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes

European Journal of Operational ResearchPublished 30 January 2003Open access
GP Gudrun Kiesmüller
Citations140
View PDF

TL;DR

It is illustrated that system performance, measured in average costs per time unit, can be improved substantially by the new approach provided, especially for large leadtime differences.

Abstract

This paper addresses the control problem of a stochastic recovery system with two stocking points and different leadtimes for production and remanufacturing. For such systems the optimal control policy for a linear cost model is not known. Therefore, in the literature several heuristic policies are investigated and analyzed. In this paper a new approach is provided which differs substantially from the existing ones. Instead of using one inventory position for the production and remanufacturing decisions we base the decisions on two aggregate variables which are defined different for different leadtime relations. By means of numerical examples we illustrate that system performance, measured in average costs per time unit, can be improved substantially by our new approach, especially for large leadtime differences.

Keywords

Business, Management and AccountingEnvironmental Science