A model for supply planning under lead time uncertainty
International Journal of Production EconomicsPublished 1 July 2002
Alexandre Dolgui, Mohamed-Aly Ould-Louly
Citations137
SJR quartileQ1
SJR score2.83
SNIP2.67
Generate an AI Snapshot to get a quick, structured summary of this paper.
Study Snapshot
ObjectiveStudy objective
MethodsResearch methodology
PopulationPopulation studied
Sample sizeSample sizes
OutcomesStudy outcomes here
ResultsStudy results comes here
LimitationsResearch study limitations comes here
A concise AI-generated summary of the paper will appear here once you click Generate AI Snapshot.
Abstract
International audience
Keywords
Business, Management and AccountingEngineering
Journal of MarketingBusiness Logistics Management
886 Citations1973D. Daryl Wyckoff, Ronald H. Ballou
European Journal of Operational ResearchSupply chain partnerships: Opportunities for operations research
403 Citations1997Michael J. Maloni, W.C. Benton
IIE TransactionsOptimal Order Policies in Assembly Systems with Random Demand and Random Supplier Delivery
111 Citations1996Haresh Gurnani, Ram Akella +1 more
IIE TransactionsLOT SIZING IN ASSEMBLY SYSTEMS WITH RANDOM COMPONENT YIELDS
88 Citations1994Yigal Gerchak, Yunzeng Wang +1 more
Naval Research Logistics (NRL)Supply management in assembly systems
88 Citations1993Chengbin Chu, Jean‐Marie Proth +1 more
This work proposes an iterative algorithm which leads to the optimal order instants of the components in the case when n components are needed to assemble a given product.
Handbooks in operations research and management scienceChapter 1 Single-Product, single-Location models
68 Citations1993Hau L. Lee, Steven Nahmias
The chapter presents an overview of the major developments and results for single product inventory management as well as a class of models based on the simplest demand assumption, that is, demand is deterministic and stationary.
Journal of Intelligent ManufacturingSupply management for cost minimization in assembly systems with random component yield times
45 Citations1997J.-M. Proth, G. Mauroy +3 more
The approach in this paper is to first define certain control parameters and thus reduce the number of the variables involved in the optimization problem, and then solve the latter problem by using sophisticated optimization techniques in conjunction with heuristic modelling.
Handbooks in operations research and management scienceChapter 11 Requirements planning
38 Citations1993Kenneth R. Baker
This chapter discusses four main areas in which MRP systems typically have shortcomings and where supplementary models can provide effective decisions support, including lot sizing, capacity planning, master scheduling, and buffering techniques.
International Journal of Production EconomicsFurther developments on safety stocks in an MRP system applying Laplace transforms and input–output analysis
35 Citations1999Robert W. Grubbström, Ou Tang
Journal of Decision SystemPlanification de systèmes d'assemblage avec approvisionnements aléatoires en composants
20 Citations1995Alexandre Dolgui, Marie‐Claude Portmann +1 more
A rolling horizon approach, which involves a linear programming model, forecasting and simulation, is used in the management of an assembly system.
