An independent inventory control heuristic for multi-component assemble-to-order systems
Generate an AI Snapshot to get a quick, structured summary of this paper.
A concise AI-generated summary of the paper will appear here once you click Generate AI Snapshot.
TL;DR
A linear approximation heuristic is developed to minimise expected holding and backlog costs and shows that this heuristic performs well in comparison to a previously proposed heuristic method in the literature called the equal-fractile heuristic.
Abstract
This article investigates an inventory control problem in a single-level multi-component assembly system. In this system, a product with random demand is assembled-to-order from a number of components. The assembler holds inventory at the component levels. We consider a periodic review inventory control system that uses an order-up-to policy for each component. Component safety stock is held to protect against the stock out risk during component replenishment lead times. We develop a linear approximation heuristic to minimise expected holding and backlog costs and show that this heuristic performs well in comparison to a previously proposed heuristic method in the literature called the equal-fractile heuristic.
