Schedule control in the White-Necked Raven, Corvus cryptoleucus
Psychonomic SciencePublished 1 July 1971Open access
Russell Haney, John A. Bedford, Robert Berryman
Citations5
Generate an AI Snapshot to get a quick, structured summary of this paper.
Study Snapshot
ObjectiveStudy objective
MethodsResearch methodology
PopulationPopulation studied
Sample sizeSample sizes
OutcomesStudy outcomes here
ResultsStudy results comes here
LimitationsResearch study limitations comes here
A concise AI-generated summary of the paper will appear here once you click Generate AI Snapshot.
Abstract
Five White-Necked ravens were run to behavioral stability on each of three moderate schedules of positive reinforcement: FR 50, FI 4 min, and RI 2.5 min. The sequence of schedule exposure for any one raven was different from that for any other raven. Temporal variations in rates emitted by the raven under these schedules were characteristic of those emitted by other species more typically used in operant conditioning studies.
Keywords
PsychologyAgricultural and Biological Sciences
Proceedings of the National Academy of SciencesON THE CLASSIFICATION OF REINFORCEMENT SCHEDULES
162 Citations1956W. N. Schoenfeld, William W. Cumming +1 more
I am indebted to Professor Lighthill for some further illuminating remarks regarding this point and his comments on Heisenberg's Theory of Isotropic Turbulence are highly illuminating.
Journal of the Experimental Analysis of BehaviorRANDOM INTERVAL SCHEDULES OF REINFORCEMENT<sup>1</sup>
77 Citations1963J. R. Millenson
A method for generating a reinforcement schedule that closely approximates idealized VI schedules in which reinforcement assignments occur randomly in time (RI schedules) is described and response rates of pigeons exposed for 20 sessions appeared very similar to response rates characteristic of arithmetic series VIs.
Journal of the Experimental Analysis of BehaviorINTERLOCKING SCHEDULES OF REINFORCEMENT<sup>1</sup>
25 Citations1962Robert Berryman, John A. Nevin
Four male pigmented rats were exposed to a procedure designed to investigate the relation between several performance measures and a schedule continuum ranging from FR 36 to FI 2 through four intermediate interlocking schedules, showing a continuum of performance related to the schedule continuum.
