A Production Scheduling Problem in the Glass-Container Industry
Generate an AI Snapshot to get a quick, structured summary of this paper.
A concise AI-generated summary of the paper will appear here once you click Generate AI Snapshot.
TL;DR
This work examines the problem of scheduling parallel production lines in the glass-container industry with a resource constraint imposed by the furnace melting rate and concludes that a shortest processing time based dispatching rule probably provides the most efficient operating policy.
Abstract
By means of a computer simulation we examine the problem of scheduling parallel production lines in the glass-container industry with a resource constraint imposed by the furnace melting rate. The results of the simulation model are combined with relevant aspects of scheduling theory to arrive at the conclusion that a shortest processing time based dispatching rule probably provides the most efficient operating policy.
