A branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment

European Journal of Operational ResearchPublished 1 February 1999
Kripa Shanker, Bimal K. Modi
Citations27
SJR quartileQ1
SJR score2.24
SNIP2.62

TL;DR

This paper addresses an inter-dependent multiple-product resource-constrained scheduling problem with the objective of makespan minimization in a flexible manufacturing system with resource flexibility.

Abstract

Abstract This paper addresses an inter-dependent multiple-product resource-constrained scheduling problem with the objective of makespan minimization in a flexible manufacturing system with resource flexibility. Both consumable and non-consumable resources are considered along with their alternative types and constrained utilization rates. A 0–1 integer linear programming formulation is presented for the problem. The complexity of the problem is observed to be at increase with the availability of alternate resources for product operations. A branch and bound based heuristic is proposed as a solution methodology. A numerical example is presented to illustrate the problem and the effectiveness of the heuristic.

Keywords

Engineering