Scheduling in a two-stage manufacturing process

International Journal of Production ResearchPublished 1 July 1984
SEETUARMA L. NARASTMHAN, SHRTKANT S. PANWALKAR
Citations70
SJR quartileQ1
SJR score2.24
SNIP2.56

TL;DR

An heuristic solution procedure known as the CMD rule is presented for this multi-product, multistage, continuous flow problem and is designed to minimize the sum of idle time of machines and in-process waiting at the second stage.

Abstract

This paper describes an industrial scheduling problem taken from a cable manufacturing process. An heuristic solution procedure known as the CMD rule is presented for this multi-product, multistage, continuous flow problem. The solution procedure is designed to minimize the sum of idle time of machines and in-process waiting at the second stage. A comparison of this rule with some standard scheduling rules is provided.